Water, wastewater, and stormwater engineering for California public agencies.

Condition assessment, risk-based capital planning, hydraulic modeling, emergency response planning, and design, scoped to the problem that keeps your agency up at night and built for a 100-year service life.

Or call Chris Ewers, P.E., directly: (916) 521-9696

Process piping along a walkway at a wastewater treatment plant

What keeps you up at night?

Every engagement starts with that question. Our direct, innovative approaches address the answers head-on to give agencies better certainty, security, and yes, better sleep.

“A force main with no inspection history, and no reliable map.”

Risk-based, vendor-neutral programs that establish what you know, what you need, and what to do first, starting with your highest-consequence pipes.

Condition assessment
“Our capital program keeps funding the squeaky wheel.”

Projects ranked by failure risk, with costs escalated to the year they bid and the staffing needed to deliver them, using our own RD/CIP software.

Capital improvement programs
“Development is coming, and we don’t know where the sewer chokes.”

Focused water, sewer, and storm models built around the question at hand, calibrated to flow monitoring and RDII, and handed to your staff to keep using.

Hydraulic modeling
“Our emergency plan isn’t something anyone on shift could use.”

System-specific plans consistent with NIMS and SEMS, written so the next O&M hire can respond, including AWIA risk and resilience work.

Emergency response planning
“New requirements, and a team that’s already stretched thin.”

From municipal code review to turnkey FOG or force main programs, we carry the work until your in-house champion is ready to take it over.

Program setup and support
“Repair, replace, rehabilitate, or refrain?”

Transparent, repeatable risk models that turn a hard capital decision into one you can explain to a board and defend years later.

Decision support

Recent work for California agencies

See all projects
Model calibration and validation plot comparing modeled and metered sewer flows with rainfall

San Rafael Sanitation District · 2025–present · Hydraulic modeling

Downtown collection system capacity assessment

Large developments proposed downtown needed a defensible picture of wet-weather sewer capacity. EEI built a 2,200-node EPA SWMM model from a survey of about 285 manholes and six new flow meters, modeling each metered sewershed with antecedent moisture to capture its RDII. The assessment pinpoints chokepoints at the 10-year, 24-hour storm, and District staff are being trained to run the model.

Crew installing a replacement manhole on the Peralta–Linda Mar trunk sewer in Pacifica

City of Pacifica · 2023–2025 · Hydraulic modeling, design, and construction services

Peralta–Linda Mar trunk sewer and manhole improvements

Modeling, conceptual through final design, and construction engineering to add capacity in a crowded utility corridor under busy streets. By replacing a manhole and improving its inlet approaches, about 900 feet of planned upsizing in Linda Mar Boulevard was eliminated, and maintenance access was improved. When excavation uncovered additional buried gas facilities, we worked with the contractor to relocate the critical manhole replacement and keep project costs down.

Crew lifting a vault lid to reach the Sump 85 force main in Sacramento

City of Sacramento Department of Utilities · 2024–2025 · Condition assessment

Sump 85 force main condition assessment program development

Won through an RFP, the program used the vital, previously failed Sump 85 force main as its template: records and a risk model, field location of a line whose appurtenances were about 40 percent undocumented, ultrasonic thickness testing, and a net-present-value go/no-go method. The City chose to begin replacement and adopted SOPs and a roughly seven-year program plan shared across four divisions.

RD/CIP: capital planning you can defend.

Our proprietary software ranks projects by modeled risk to the community, escalates costs to the year each project goes out to bid, and forecasts the staffing needed to deliver the program. The City of Vallejo selected RD/CIP to prioritize a system of nearly 600 miles of water main, 23 reservoirs, 19 pump stations, and 7 dams.

How RD/CIP works
RD/CIP chart of capital expenditures and risk levels addressed each year for the City of Vallejo
Expenditures and risk levels addressed each year, City of Vallejo water CIP.
Chris Ewers, P.E., Principal Engineer and CEO

Work directly with the principal.

Chris Ewers founded Ewers Engineering in 2013 to sustain intelligent, effective water infrastructure in public agencies. He brings more than 27 years of planning, design, and construction-phase experience in water, wastewater, and stormwater, and a conviction that a facility reaches its 100-year service life only when diligent engineering is paired with sound operations and maintenance.

Civil P.E. in California (No. 69612), Washington, Idaho, and Wyoming.

About Chris and the firm

Recent talks

A solid understanding of pump station outage times lets agency O&M staff plan downstream improvements, and decide whether bypasses and other extreme measures will be necessary. The steps from guesstimates to workable, seasonally dependent outage ranges are fairly simple, and a willing team of observant people can carry them out.

All insights

CWEA Annual Conference (AC26) · April 9, 2026

Pump Station Outage Duration Refinement

Slides (PDF)

20th Annual Sewer and Stormwater Summit · October 9, 2025

How Long Can You Hold Out?

Slides (PDF)

Agencies we’ve worked with

All clients and projects
Map of California marking the cities and districts Ewers Engineering has served
  • City of Sacramento
  • City of San Diego
  • City of Davis
  • City of Livermore
  • City of Millbrae
  • City of Pacifica
  • City of Redwood City
  • City of Vallejo
  • San Rafael Sanitation District
  • Dublin San Ramon Services District
  • Fairfield-Suisun Sewer District
  • Sacramento Suburban Water District

Tell us what’s keeping you up at night.

A 30-minute call with Chris is the quickest way to find out whether we can help and what it would take. In the Sacramento–Roseville area? The coffee’s on him.
(916) 521-9696 · info@ewersengineering.com