“A force main with no inspection history, and no reliable map.”
Risk-based, vendor-neutral programs that establish what you know, what you need, and what to do first, starting with your highest-consequence pipes.
Condition assessmentCondition assessment, risk-based capital planning, hydraulic modeling, emergency response planning, and design, scoped to the problem that keeps your agency up at night and built for a 100-year service life.
Or call Chris Ewers, P.E., directly: (916) 521-9696

Every engagement starts with that question. Our direct, innovative approaches address the answers head-on to give agencies better certainty, security, and yes, better sleep.
“A force main with no inspection history, and no reliable map.”
Risk-based, vendor-neutral programs that establish what you know, what you need, and what to do first, starting with your highest-consequence pipes.
Condition assessment“Our capital program keeps funding the squeaky wheel.”
Projects ranked by failure risk, with costs escalated to the year they bid and the staffing needed to deliver them, using our own RD/CIP software.
Capital improvement programs“Development is coming, and we don’t know where the sewer chokes.”
Focused water, sewer, and storm models built around the question at hand, calibrated to flow monitoring and RDII, and handed to your staff to keep using.
Hydraulic modeling“Our emergency plan isn’t something anyone on shift could use.”
System-specific plans consistent with NIMS and SEMS, written so the next O&M hire can respond, including AWIA risk and resilience work.
Emergency response planning“New requirements, and a team that’s already stretched thin.”
From municipal code review to turnkey FOG or force main programs, we carry the work until your in-house champion is ready to take it over.
Program setup and support“Repair, replace, rehabilitate, or refrain?”
Transparent, repeatable risk models that turn a hard capital decision into one you can explain to a board and defend years later.
Decision support
Large developments proposed downtown needed a defensible picture of wet-weather sewer capacity. EEI built a 2,200-node EPA SWMM model from a survey of about 285 manholes and six new flow meters, modeling each metered sewershed with antecedent moisture to capture its RDII. The assessment pinpoints chokepoints at the 10-year, 24-hour storm, and District staff are being trained to run the model.

Modeling, conceptual through final design, and construction engineering to add capacity in a crowded utility corridor under busy streets. By replacing a manhole and improving its inlet approaches, about 900 feet of planned upsizing in Linda Mar Boulevard was eliminated, and maintenance access was improved. When excavation uncovered additional buried gas facilities, we worked with the contractor to relocate the critical manhole replacement and keep project costs down.

Won through an RFP, the program used the vital, previously failed Sump 85 force main as its template: records and a risk model, field location of a line whose appurtenances were about 40 percent undocumented, ultrasonic thickness testing, and a net-present-value go/no-go method. The City chose to begin replacement and adopted SOPs and a roughly seven-year program plan shared across four divisions.
Our proprietary software ranks projects by modeled risk to the community, escalates costs to the year each project goes out to bid, and forecasts the staffing needed to deliver the program. The City of Vallejo selected RD/CIP to prioritize a system of nearly 600 miles of water main, 23 reservoirs, 19 pump stations, and 7 dams.
How RD/CIP works

Chris Ewers founded Ewers Engineering in 2013 to sustain intelligent, effective water infrastructure in public agencies. He brings more than 27 years of planning, design, and construction-phase experience in water, wastewater, and stormwater, and a conviction that a facility reaches its 100-year service life only when diligent engineering is paired with sound operations and maintenance.
Civil P.E. in California (No. 69612), Washington, Idaho, and Wyoming.
About Chris and the firmA solid understanding of pump station outage times lets agency O&M staff plan downstream improvements, and decide whether bypasses and other extreme measures will be necessary. The steps from guesstimates to workable, seasonally dependent outage ranges are fairly simple, and a willing team of observant people can carry them out.

A 30-minute call with Chris is the quickest way to find out whether we can help and what it would take. In the Sacramento–Roseville area? The coffee’s on him.
(916) 521-9696 · info@ewersengineering.com